Vicki Nova's 1959 Apache pick up Project
+11
Reb Stew
JRiggs
Admin
RustyKarr
6-71Kid
xycho_wraith
big dogs 42
FalconEddie1964
falconwagon62
vettespd29
RebStew
15 posters
Page 2 of 3
Page 2 of 3 • 1, 2, 3
Re: Vicki Nova's 1959 Apache pick up Project
That sure is a shiney raditor for a hillbilly. I need to take that one off your hands. lol
Re: Vicki Nova's 1959 Apache pick up Project
Admin wrote:That sure is a shiney raditor for a hillbilly. I need to take that one off your hands. lol
a gift from Tommy boy, Vicki's son, he ordered it for his 74 challenger, sold it without it....and he ordered one, they sent him two and told him to keep it! So I have one for my F100,... Bubba when he gets the roller 5.0 and the AOD.....
Re: Vicki Nova's 1959 Apache pick up Project
Been a busy couple of weeks, the motor lined up, and mocking up the mounts, next comes pressure washing and SEM Black, Frame, Firewall, and under the cab. Then install the 9" FORD rear end in that chebby.....
Re: Vicki Nova's 1959 Apache pick up Project
wow, been 3 months...but made the frame mounts for the chevrolet today, also making the tranny mount, took a 15 minute break....back to work!....pics coming...
Re: Vicki Nova's 1959 Apache pick up Project
PICs and Video!!!
ok pix....
Home made cross member;
Welding the cross member click on the picture to watch;
Motor Mounts; New Chev V8, in a 59 truck, with a Volare' sub frame..who designed the mess!!! lol
Metal Devil Saw in action click on picture and watch;
Remember, I am a salesman...just a old hot rod builder...I do NOT do this for a living...I try to buy Local, buy USA made, and do everything my self...and on this one, that includes Paint and interior.....Stay tuned, next Exhaust and Wiring, install the 9" rearend....
ok pix....
Home made cross member;
Welding the cross member click on the picture to watch;
Motor Mounts; New Chev V8, in a 59 truck, with a Volare' sub frame..who designed the mess!!! lol
Metal Devil Saw in action click on picture and watch;
Remember, I am a salesman...just a old hot rod builder...I do NOT do this for a living...I try to buy Local, buy USA made, and do everything my self...and on this one, that includes Paint and interior.....Stay tuned, next Exhaust and Wiring, install the 9" rearend....
Re: Vicki Nova's 1959 Apache pick up Project
been a few weeks...I love building them, I know some of you guys think I only do them and flip them...not true, I do love a few of the cars, but in the end, all of them are just stuff, I look back at when I started building this, how some of you came out to help me pull the volare' clip out, some of you, well most of you, I had NEVER meet, but yet you came to help, speaks more about you, and I like what you're saying!!!
cutting the stock 6 lug rear end out....
9" rear getting ready to install, cut and ground off mounting pads...
bolted down....the pig 3:50:1 ratio is JUNK...anybody got a 28 Spline pig ready to load???
sitting a little to low....looks neat, but gotta raise it....not as tall as a gallon thinner can...
cutting the stock 6 lug rear end out....
9" rear getting ready to install, cut and ground off mounting pads...
bolted down....the pig 3:50:1 ratio is JUNK...anybody got a 28 Spline pig ready to load???
sitting a little to low....looks neat, but gotta raise it....not as tall as a gallon thinner can...
Re: Vicki Nova's 1959 Apache pick up Project
I don't know. I always liked them in the weeds.
RebStew- Scrounger's Pitbull On Nitrous
- Number of posts : 12420
Registration date : 2007-10-09
Age : 95
Location : Newport Ky
Re: Vicki Nova's 1959 Apache pick up Project
the pig in the rear was JUNK...pick up another for $25 dollars from a buddy in Goshen..I will be installing it, and working on it, over the weekend....Like to get running over the weekend...then exhaust system next week.....
Re: Vicki Nova's 1959 Apache pick up Project
Started the wiring today, REBEL 9 circut, Also installed new gauges...
Re: Vicki Nova's 1959 Apache pick up Project
i like those gauges
JRiggs- Scrounger
- Number of posts : 3505
Registration date : 2007-10-09
Age : 44
Location : erlanger ky
Re: Vicki Nova's 1959 Apache pick up Project
installed a new HEI, Plugs, New MSD wires...Exhaust Manifolds, new studs in the manifolds....tonight
Will start hooking up wiring, sanding a painting frame and installing sheet metal and install radiator.....running and driving SOON.....
Will start hooking up wiring, sanding a painting frame and installing sheet metal and install radiator.....running and driving SOON.....
Re: Vicki Nova's 1959 Apache pick up Project
got some shop time today, cleaned the frame and firewall, primed it all up, painting this week and will start installing the front end, also gotta put the bed on and fit all that up, install the brakes, and take to Muffler shop....
Re: Vicki Nova's 1959 Apache pick up Project
Pushed this one out of the way for a while, as I have to cash flow mama's toys as well!!! Now setting ride height, so bed mocked up, next front end going on....also installing the hanging pedal and under hood Power Brake set up.....I told her, she will drive it before the end of the month....
Last edited by falconwagon62 on July 24th 2012, 3:12 am; edited 1 time in total
Reb Stew- National President
- Number of posts : 7905
Registration date : 2012-04-08
Age : 104
Location : Looking in your window
Re: Vicki Nova's 1959 Apache pick up Project
Got the hanging pedal installed, and booster bolted down, now I need a Valve...anybody got one?? or should I just hit Pull & Pay.....Like to have the brakes on, and seal the tank, maybe fire it up this weekend....
Re: Vicki Nova's 1959 Apache pick up Project
Seeing Earl do more in 2 weeks than I did in a year, back on mama's truck, Changing the rear end to a narrow 8" for tire clearance, also ordered all new bushings and shackles.....So Back to the shop for more work, trying to have Motor wired up and gauge cluster installed tonight, and hook up Trans and shifter tomorrow....
Re: Vicki Nova's 1959 Apache pick up Project
Who did you order the bushings from?
Reb Stew- National President
- Number of posts : 7905
Registration date : 2012-04-08
Age : 104
Location : Looking in your window
Re: Vicki Nova's 1959 Apache pick up Project
LMC had the best price going, 2 front bushings/pins & Rear shackles/pins/bushings.....133 delivered....mama's were plum wore out!!!
Re: Vicki Nova's 1959 Apache pick up Project
Sweet! Mama will be thrilled to get her rig back on the road soon.
Later,
Lee
Later,
Lee
Nanook- Scrounger
- Number of posts : 1088
Registration date : 2010-06-28
Age : 52
Location : Walton, KY
Re: Vicki Nova's 1959 Apache pick up Project
Great build, Love the wrap around rear glass.
frmula505- Floor sweep
- Number of posts : 71
Registration date : 2010-12-22
Age : 63
Location : New Mexcio
Re: Vicki Nova's 1959 Apache pick up Project
Finished pushing out the pins in the leaf springs, the popped out the bushings in the springs.....also cleaned the rear of the frame painted it, gotta do the insides a bit and under the truck, also need to climb under and hook up the torque converter to the Flexplate and count the teeth so I know what starter to put on, also wired the motor, hooking up Oil pressure, temp gauges, wiring the distributor and power to the choke.....
frmula505- Floor sweep
- Number of posts : 71
Registration date : 2010-12-22
Age : 63
Location : New Mexcio
Re: Vicki Nova's 1959 Apache pick up Project
looking good..
SouthGaKidd- Scrounger
- Number of posts : 95
Registration date : 2013-07-11
Age : 36
Location : waycross,ga
Page 2 of 3 • 1, 2, 3
Similar topics
» Vicki Novas mama...Bad News...prayers needed
» Vicki Novas 1957 Chevrolet Sport Sedan-4 door Hardtop Build
» Vicki Nova's 1967 Pontiac GTO 400-4 speed PROJECT CAR
» JBS10, Johnny's 51 Chevy Pick~'em up project
» 57 chevy apache speedo cluster ~ SOLD
» Vicki Novas 1957 Chevrolet Sport Sedan-4 door Hardtop Build
» Vicki Nova's 1967 Pontiac GTO 400-4 speed PROJECT CAR
» JBS10, Johnny's 51 Chevy Pick~'em up project
» 57 chevy apache speedo cluster ~ SOLD
Page 2 of 3
Permissions in this forum:
You cannot reply to topics in this forum
|
|